Overview

Basics

Basics
This project aims to add safety improvements along Lake Tahoe Blvd from Sawmill Rd to Viking Rd/D St. Key features of this project include, but not limited to: providing a safer and more comfortable space for cyclists by creating a designated cycling lane with an additional buffer zone between cyclists and motor vehicles; providing dedicated turn lanes at the Industrial Ave intersection, and tying into the City of South Lake Tahoe's recently completed Lake Tahoe Boulevard Class 1 Bicycle Trail (03.02.02.0077).

Planning/Design
2030
2032
2034
$2,500,000

Donaldo Palaroan (donaldo.palaroan@edcgov.us)
03/13/2025
03/13/2025
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
Latitude: 38.8933
Longitude: -120.0224
Watershed: Upper Truckee River
Info:  

Organizations

Organizations
El Dorado County, CA (ELDO) Donaldo Palaroan - El Dorado County, CA (ELDO)

EIP Details

EIP Basics

03.02.02.0119 - Lake Tahoe Boulevard Buffered Bike Lane Project

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital
$2,971,714 (Using 2.50% annual inflation)

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Impervious Coverage Retired [Land Capability of Coverage Retired: 1b], [Type of Coverage Retired: Existing] 58542 square feet
Miles of Pedestrian and Bicycle Routes Improved or Constructed None miles

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$2,500,000
$0
$2,500,000

No funding sources identified for this project.

Reported Expenditures

Reported Expenditures

No expenditures have been reported for this project.

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

No Related Projects set for this project.

No external links entered.

Notes

Notes

No notes entered.