Overview

Basics

Basics
This project will capture the State of Nevada Upland TMDL Road Management Program progress. This project will only report TMDL performance measures and will not include expenditure data. Expenditure data will be reported on a project-level with individual projects reporting expenditures for that specific project. For more information on the implementation of the Lake Tahoe TMDL, go to: https://www.enviroaccounting.com/TahoeTMDL/Program/Home

Implementation
2004
2004

Christopher LaCasse (chris.lacasse@lands.nv.gov)
03/23/2015
02/20/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Performance Measures

Expected Performance Measures

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Property Ownership Road Type Treatment Type
Nevada Division of State Lands Unpaved Retrofitted 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 miles
Total 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 miles
Linear Feet of Stream Channel Restored or Enhanced
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Action Performed Watershed
Enhanced Tahoe State Park 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 linear feet
Restored Tahoe State Park 900 1,000 0 0 0 0 0 0 0 0 0 0 0 0 1,900 linear feet
Total 0 0 0 900 1,000 0 0 0 0 0 0 0 0 0 0 0 0 1,900 linear feet
Forest Roads Inspected and Maintained
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Ownership Road Operation Type Road Type
Nevada Tahoe Resources Team Inspected Unpaved 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 248.2 miles
Nevada Tahoe Resources Team Maintained Unpaved 0.7 4.7 0.63 0.63 0.63 0.63 0.64 0.64 0.38 0 0 9.58 miles
Total 14.6 14.6 14.6 14.6 14.6 14.6 15.3 19.3 15.23 15.23 15.23 15.23 15.24 15.24 14.98 14.6 14.6 257.78 miles
Forest Roads Created
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Ownership Road Type
Nevada Tahoe Resources Team Unpaved 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 miles
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 miles
Disturbed Areas Restored, Enhanced, or Created
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Disturbed Area Treatment Type Ownership
Enhanced Nevada Tahoe Resources Team 0 0 0 0 1.4 1.4 0 0.5 0 0 3.3 acres
Restored Nevada Tahoe Resources Team 0 0 0 0.7 1.1 0 0.6 2.4 acres
Total 0 0 0 0.7 1.1 0 0.6 0 0 0 0 1.4 1.4 0 0.5 0 0 5.7 acres
Forest Upland Facilities Retrofitted for Stormwater
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units
Ownership Type of Retrofit Action
Nevada Tahoe Resources Team Retrofitted 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 number
Total 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 number

No accomplishments to report for:
Year(s) 2004, 2005, 2006
Explanation Accomplishments were previously reported for prior years.

Funding

Expected Funding

Expected Funding
$0

No funding sources identified for this project.

Reported Expenditures

Reported Expenditures
Total 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007
Lake Tahoe License Plate Program $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Question 1 (NV State Parks) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Grand Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

No Threshold Categories set for this project.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
11/19/2021 3:38 PM Christopher LaCasse Miles of roads maintained: 0.38 miles of waterbar improvements and outlet clearing was completed in the North Canyon watershed by NDF personnel.

Disturbed areas restored, enhanced, or created: Site preparation was completed on 0.5 acre at the Spooner Landscape Resilience Project site, 36% of the site area of 1.4 acres. Work entailed cleaning up excess woody debris, chips, and logging slash, uncovering buried vegetation, leveling mounds of dirt, and raking the surface for natural, native plant seeding - primarily bitterbrush, mountain big sage, Jeffrey pine and wax currant. All the landing slash was piled for burning in 2021.
01/14/2020 11:28 AM Christopher LaCasse Miles of roads maintained: 0.51 miles of waterbar maintenance was completed in the North Canyon watershed by NDF crews, and 0.13 miles of waterbar maintenance was completed by NDSP employees and volunteers. A 10 sq. foot sinkhole draining from North Canyon road into streambed approximately 3 miles up North Canyon was filled in by NDSP maintenance staff.

Disturbed areas restored, enhanced, or created: Restoration work continued on the 1.4 acre log landing utilized during implementation of the Spooner Landscape Resilience Project.  Vegetation which includes conifer seedlings, annual forbs, perennial forbs, annual and perennial grasses, brush species (mountain big sagebrush, wax current, green leaf manzanita, rabbit brush, tobacco brush, mountain white thorn,) was established on 65% of the area and survived through the summer and fall period.  The area without plants will be surveyed this spring for new germinants and if plants are absent it will be seeded or plants transplanted into the area. The area was signed, informing recreationists of rehabilitation; additionally, area adjacent to Spooner cabin access road was fenced off to prevent foot traffic on rehabilitating area. Fence will be removed next year. At the North Canyon and Spooner Cabin road intersection, approximately 300 sq. ft. of road was rehabilitated after road-widening to allow access for heavy equipment.
01/03/2019 9:58 AM Meredith Gosejohan Miles of roads maintained: At Spooner in LTNSP, 0,43 mi of waterbar maintenance was completed on the road spur north out of the south landing and 0.2 mi of waterbars were installed on Spooner cabin access road.

Disturbed areas restored, enhanced or created: At Spooner in LTNSP, 1.4 acres of a previous landing were disturbed by operations during the Spooner Landscape Resilience Project. BMPS were installed (area was enhanced) in 2018 and rehabilitation work will continue in 2019. The landing access temporary road is included in the acreage total.
01/10/2018 10:44 AM Elizabeth Kingsland There was some late season road repair on North Canyon Road by NDSP. They imported 4 yards of native soil/DG to repair a developing gully just north of the saddle. They built 1 new waterbar during the repair and cleaned/repaired a number of others (9). Seasonal staff cleaned and repaired waterbars throughout the park including Marlette to Hobard.
02/29/2016 9:51 AM Elizabeth Kingsland In calendar year 2015, water bars were implemented on North Canyon road from the South to West Landing (1,400') and near the top of the ridge (2,500'). Also on Tunnel Creek Road, 800' of road was implemented with water bars (from the intersection to SR28).
04/15/2015 11:03 AM Elizabeth Kingsland In calendar year 2014, road maintenance occurred on North Canyon road.